the first job posted in removal of carpet in a residence, replacing the sub-floor and installation of hardwood flooring.
First job site
Up comes old sub-floor
New material
Inspecting the material
Don't need this many
Truck tire needs air. Wood loaded into garage.
Down goes the new floor
| New pieces under the windows |
| Liquid Nails and new wood framing for more stability |
| Need to add some additional framing |
| Leveled and tacked into place - before screws |
| Another trip for more framing material |
| Air compressor and hoses |
| Trash compacting |

No comments:
Post a Comment