Day 9 and 10

Hardwood continues to go down.

Bottom of the stairs - left covered for customer.

Where work had finished in the dining room.  Kitchen to the left.

Hardwood installed.

Rebuilding landing at the bottom of steps, adding framing.

Bottom of the steps all framed, lighter wood is new.

Alternate view, hand framing nailer to left, air powered to the right.




Attaching sub-floor to landing.

Last of sub-floor installed.

Jigsaw to fit flooring around floor electric receptacle.

Flooring nailer.

New flooring nailer.

Floor going down.


Tools of the trade.

Visitors.


Dining room almost complete.

Friday, October 21, 2011

Monday, October 10, 2011

Day Three

Rainbow! On the ride North to Maryland.
Looking down from a few steps up, glove in the foreground.


Another piece comes up.

End of above garage and then above half bath.

Liquid nails, now time to put down the board.


From stairs looking down.

Looking down the stairs.

On the right, reinforce joist on both sides.

How to rewire the cable box.

How tube television was wired.

How tube television was wired.

Living room floor being closed up. 

On the left, look at all the black screwheads.  Again, on the right, reinforced joist.  Far right, water headed to fixtures.

Above half bath.

More living room.

From the stairs.








Joist that was reinforced.

Above half bath.

Wire up the sub woofer.

At bottom DVD and above is Audio switcher.

Audio and Video.

Digital sound in and sound going out.

Sound box before any wires are removed.