| Bottom of the stairs - left covered for customer. |
| Where work had finished in the dining room. Kitchen to the left. |
| Hardwood installed. |
| Rebuilding landing at the bottom of steps, adding framing. |
| Bottom of the steps all framed, lighter wood is new. |
| Alternate view, hand framing nailer to left, air powered to the right. |
| Attaching sub-floor to landing. |
| Last of sub-floor installed. |
| Jigsaw to fit flooring around floor electric receptacle. |
| Flooring nailer. |
| New flooring nailer. |
| Floor going down. |
| Tools of the trade. |
| Visitors. |
| Dining room almost complete. |
































