Monday, October 24, 2011

Day 9 and 10

Hardwood continues to go down.

Bottom of the stairs - left covered for customer.

Where work had finished in the dining room.  Kitchen to the left.

Hardwood installed.

Rebuilding landing at the bottom of steps, adding framing.

Bottom of the steps all framed, lighter wood is new.

Alternate view, hand framing nailer to left, air powered to the right.




Attaching sub-floor to landing.

Last of sub-floor installed.

Jigsaw to fit flooring around floor electric receptacle.

Flooring nailer.

New flooring nailer.

Floor going down.


Tools of the trade.

Visitors.


Dining room almost complete.

No comments:

Post a Comment